Monthly Archives: August 2014

The Rise of Manufactured Systems in Architectural Design

One of the many things that have changed in the practice of architecture during the last 50 years is our dependence on manufactured building systems. Architectural education and training 50 years ago included the detailed design of components like windows,

Posted in Construction Documents, Design, Practice Management, Specifications

The Role of the Spec Writer

Reading recent grumblings by specifications (spec) consultants, I started thinking back over the roles of the spec writers at firms where I have worked since I began my architectural career in the 1960s. Spec writing and related technologies have changed

Posted in Construction Documents, Design, Practice Management, Project Administration, Project Management, Specifications

CAUTION

The content provided on this site and in the Posts is intended to be entertaining, thought-provoking, and educational. It is not intended as direction or recommendations for the design or construction of any specific building project. The information is provided in good faith but without assurance as to its completeness, accuracy, or suitability for any particular purpose. If you are considering using information provided on this site, you are responsible for verifying its appropriateness to your needs, and you assume all risk for its use.