Value Engineering

Any discussion of value engineering (V.E.) is likely to produce a rush of criticisms of the process if you work in an architecture or engineering practice. The architects and engineers are likely to recall bad experiences when V.E. was started

Posted in Construction Administration, Design, Project Administration, Project Management

“By Others” and “N.I.C.”

The terms “By Others” and “Not In Contract” (or “N.I.C.”) can add confusion to construction documents if the intent of the terms is not well established within the documents. The note “By Others” on a drawing may be intended to

Posted in Construction Administration, Design, Project Management

Reviewing the Contractor’s Application for Payment

On most public construction projects, the Architect reviews the Contractor’s monthly Applications for Payment (a.k.a. “Requisitions”) and certifies the amount to be paid to the Contractor for that month. If the Application is made on AIA Document G702, the front

Posted in Construction Administration, Project Management

Manage Design Costs with Early Project Overtime

One of Mike’s PM tips for managing design costs on a project: “If you know you are going to have to work overtime on a project,” he said, “do it in the beginning. It costs less to do overtime when

Posted in Project Administration, Project Management

My 50-50 Rule

Jobs vary in the proportion of time required for technical work (“stuff”) vs. people work (communication, cooperation, management, etc.). Some jobs may consist of less than 50% stuff, but most jobs done effectively require at least 50% people work. If

Posted in Design, Practice Management, Project Management, Specifications

The Architect’s role at the construction site

As construction began on a building, the architect’s field representative was approached by the electrical subcontractor. The subcontractor wanted the architect’s approval to install all distribution conduit at a specific level and prior to construction of interior partitions and mechanical

Posted in Construction Administration, Project Management

Purposeful chaos (the 2-minute design offense)

While throwing staff at a project at the last minute is likely to be counterproductive (see Staffing a design project), an imminent project deadline can ignite productive and purposeful chaos that is otherwise hard to generate. Consider the possible accomplishments

Posted in Project Management

Proactive coordination meetings on the go

When an architect assembles a conference room full of consultants for a coordination meeting, power and status can sometimes interfere with productive coordination. Some of the consultants may have traveled for hours, may feel uncomfortable or out of their element,

Posted in Project Management

Value Engineering can add value

Architects and engineers may be used to thinking of Value Engineering as a form of design torture, where value is stripped out of a project design in order to save money. But Value Engineering can also provide an opportunity to

Posted in Project Administration, Project Management

It takes timely money to make a project go

A project owner was feeling frustrated that the contractor, who was doing work of good quality, was not going fast enough. Considering the contractor’s monthly application for payment, the owner decided to not pay the contractor for the previous month’s

Posted in Construction Administration, Project Administration, Project Management

CAUTION

The content provided on this site and in the Posts is intended to be entertaining, thought-provoking, and educational. It is not intended as direction or recommendations for the design or construction of any specific building project. The information is provided in good faith but without assurance as to its completeness, accuracy, or suitability for any particular purpose. If you are considering using information provided on this site, you are responsible for verifying its appropriateness to your needs, and you assume all risk for its use.